Hollinger
Mine No. 26 Shaft
Timmins, Ontario
Gold Mine, 1910-1968
The Hollinger Mine operated 27 (surface and internal) shafts at its gold mine
in Timmins. The No. 26 Shaft was the first concrete headframe built in Canada.
The mine produced 19.3 million ounces of gold.