The
below grade trench is approximately 30 ft deep and 47 feet wide, allowing for
2 tracks with enough height clearance for a double stacked container train.
A maintenance road is also provided in the trench, which could be converted
into a 3rd rail in the future. An at-grade rail line remains to maintain rail
service to industries situated along the corridor.